HDPE Pipe Fittings 90 45 Elbow PE Fitting Plastic Polyethylene Sewage Pipe Joint For Drainage Irrigation
----------------------------------------
Basic Info.
Outer Diameter DN (mm) |
SDR 9 PN20 |
SDR 11 PN16 |
SDR 13.6 PN12.5 |
SDR 17 PN10 |
SDR21 PN8 |
SDR26 PN6 |
Wall Thick Ness(mm) | ||||||
20 | 2.3 | 2.3 | ||||
25 | 3 | 2.3 | 2.3 | |||
32 | 3.6 | 3 | 2.4 | |||
40 | 4.5 | 3.7 | 3 | 2.4 | ||
50 | 5.6 | 4.6 | 3.7 | 3 | ||
63 | 7.1 | 5.8 | 4.7 | 3.8 | ||
75 | 8.4 | 6.8 | 5.6 | 4.5 | ||
90 | 10.1 | 8.2 | 6.7 | 5.4 | 4.3 | |
110 | 12.3 | 10 | 8.1 | 6.6 | 5.3 | 4.2 |
125 | 14 | 11.4 | 9.2 | 7.4 | 6 | 4.8 |
140 | 15.7 | 12.7 | 10.3 | 8.3 | 6.7 | 5.4 |
160 | 17.9 | 14.6 | 11.8 | 9.5 | 7.7 | 6.2 |
180 | 20.1 | 16.4 | 13.3 | 10.7 | 8.6 | 6.9 |
200 | 22.4 | 18.2 | 14.7 | 11.9 | 9.6 | 7.7 |
225 | 25.2 | 20.5 | 16.6 | 13.4 | 10.8 | 8.6 |
250 | 27.9 | 22.7 | 18.4 | 14.8 | 11.9 | 9.6 |
280 | 31.3 | 25.4 | 20.6 | 16.6 | 13.4 | 10.7 |
315 | 35.2 | 28.6 | 23.2 | 18.7 | 15 | 12.1 |
355 | 39.7 | 32.2 | 26.1 | 21.1 | 16.9 | 13.6 |
400 | 44.7 | 36.3 | 29.4 | 23.7 | 19.1 | 15.3 |
450 | 50.3 | 40.9 | 33.1 | 26.7 | 21.5 | 17.2 |
500 | 55.8 | 45.4 | 36.8 | 29.7 | 23.9 | 19.1 |
560 | 62.5 | 50.8 | 41.2 | 33.2 | 26.7 | 21.4 |
630 | 70.3 | 57.2 | 46.3 | 37.4 | 30 | 24.1 |
710 | 64.5 | 52.2 | 42.1 | 33.9 | 27.2 | |
800 | 72.7 | 58.8 | 47.4 | 38.1 | 30.6 | |
900 | 81.8 | 66.2 | 53.3 | 42.9 | 34.4 | |
1000 | 90.2 | 72.5 | 59.3 | 47.7 | 38.2 | |
1200 | 88.2 | 67.9 | 57.2 | 45.9 | ||
1400 | 102.9 | 82.4 | 66.7 | 53.5 | ||
1500 | 110.2 | 88.2 | 71.4 | 57.6 | ||
1600 | 117.6 | 94.1 | 76.2 |
61.2 |
Advantage
Significant advantages such as light weight, corrosion resistance, low water flow resistance, energy saving, simple and rapid installation, and low cost
Details
Application
Urban tap water pipe network system;
Urban and rural drinking water pipelines;
Agricultural irrigation pipes;
Mine mortar conveying pipeline;
Protective sleeves for post and telecommunications lines and power wires;
Material and liquid transportation pipelines in chemical, chemical fiber, food, forestry, printing and dyeing, pharmaceutical, light industry, papermaking, metallurgical and other industries.
Certificate
Company Profile
High Mountain Pipe is a specialized enterprise that produces anticorrosive plastic (pp, frpp, pe, hdpe, pvdf, pph, upvc, cpvc, abs) pipes, fittings, plates, and valves. The company's pipe production diameter is up to 1200mm, and the plate production width is up to 2000mm, and the length is unlimited. In 2006, the company passed ISO9001-2000 quality management system certification, ISO14001 environmental system certification, OHSA18001 occupational health and safety system certification, CMMI certification, and IEC27001 information security system certification.
The company adheres to the tenet of "integrity-based, technological innovation, quality assurance, and customer first", and continuously introduces and absorbs advanced plastic production technology and equipment from well-known domestic and foreign companies to produce and sell antistatic polyethylene pipes and glass fiber reinforced polypropylene pipes. , Pp pipe, pe pipe, pp board, pp air pipe, frpp pipe, pph pipe, pvdf pipe, hdpe pipe, pph pipe, upvc pipe, cpvc pipe, pp storage tank and other chemical anticorrosive products. The company's products are widely used in petroleum, chemical, electric power, smelting, mining, chemical fiber, water supply and drainage, coal mines, water conservancy dredging, sewage treatment and other fields, and are well received by users.
FAQ
Q: What is the purpose of this pipeline?
A: It is mainly used to transport liquids, and is used on a large scale in urban water supply projects, farmland irrigation, etc.
Q: Which payment method can your company use?
A: T/T, L/C or full trade insurance. You can choose the one that is convenient for you.
Q: How and when can I receive my goods after payment?
A: For small batch products, they will be delivered to you by international express (DHL, FedEx, TNT, etc.) or by air. It usually takes 3-5 days to receive the goods after delivery. For high-volume products, it is worthwhile to see the goods and deliver them. It takes several days to several weeks to reach the destination port, depending on the location of the port.