HDPE Pipe Fittings Black Hdpe Plastic Steel Wire Skeleton Reducing Tee
----------------------------------------
Basic Info.
Paste the characteristics of the parts to be welded (such as melting time) on the parts. The electrofusion control unit (ECU) provides the electrical energy required by the heating coil. After the coil is energized, the materials close to it melt to form an expansion pool. The expansion pool is in contact with the pipe surface. The continuously introduced heat energy promotes the melting of the pipe surface, resulting in a mixture of pipe melt and pipe fitting melt. This is essential for flawless welding. After the thermal cycle is over, the fittings and pipes are cooled, and the molten material solidifies to form a firm joint.
After the coil is energized, it will form a hot zone and a cold zone, some terms are also called melting zone and freezing zone. The length of these areas is particularly important. Each area ensures that the welding is controlled at the precise length of the accessory socket, ensuring that the melt pressure is controlled during the entire connection process. The precise control, pitch and position of the coil relative to the inner surface of the socket can ensure uniform heat distribution.
Outer Diameter DN (mm) |
SDR 9 PN20 |
SDR 11 PN16 |
SDR 13.6 PN12.5 |
SDR 17 PN10 |
SDR21 PN8 |
SDR26 PN6 |
Wall Thick Ness(mm) | ||||||
20 | 2.3 | 2.3 | ||||
25 | 3 | 2.3 | 2.3 | |||
32 | 3.6 | 3 | 2.4 | |||
40 | 4.5 | 3.7 | 3 | 2.4 | ||
50 | 5.6 | 4.6 | 3.7 | 3 | ||
63 | 7.1 | 5.8 | 4.7 | 3.8 | ||
75 | 8.4 | 6.8 | 5.6 | 4.5 | ||
90 | 10.1 | 8.2 | 6.7 | 5.4 | 4.3 | |
110 | 12.3 | 10 | 8.1 | 6.6 | 5.3 | 4.2 |
125 | 14 | 11.4 | 9.2 | 7.4 | 6 | 4.8 |
140 | 15.7 | 12.7 | 10.3 | 8.3 | 6.7 | 5.4 |
160 | 17.9 | 14.6 | 11.8 | 9.5 | 7.7 | 6.2 |
180 | 20.1 | 16.4 | 13.3 | 10.7 | 8.6 | 6.9 |
200 | 22.4 | 18.2 | 14.7 | 11.9 | 9.6 | 7.7 |
225 | 25.2 | 20.5 | 16.6 | 13.4 | 10.8 | 8.6 |
250 | 27.9 | 22.7 | 18.4 | 14.8 | 11.9 | 9.6 |
280 | 31.3 | 25.4 | 20.6 | 16.6 | 13.4 | 10.7 |
315 | 35.2 | 28.6 | 23.2 | 18.7 | 15 | 12.1 |
355 | 39.7 | 32.2 | 26.1 | 21.1 | 16.9 | 13.6 |
400 | 44.7 | 36.3 | 29.4 | 23.7 | 19.1 | 15.3 |
450 | 50.3 | 40.9 | 33.1 | 26.7 | 21.5 | 17.2 |
500 | 55.8 | 45.4 | 36.8 | 29.7 | 23.9 | 19.1 |
560 | 62.5 | 50.8 | 41.2 | 33.2 | 26.7 | 21.4 |
630 | 70.3 | 57.2 | 46.3 | 37.4 | 30 | 24.1 |
710 | 64.5 | 52.2 | 42.1 | 33.9 | 27.2 | |
800 | 72.7 | 58.8 | 47.4 | 38.1 | 30.6 | |
900 | 81.8 | 66.2 | 53.3 | 42.9 | 34.4 | |
1000 | 90.2 | 72.5 | 59.3 | 47.7 | 38.2 | |
1200 | 88.2 | 67.9 | 57.2 | 45.9 | ||
1400 | 102.9 | 82.4 | 66.7 | 53.5 | ||
1500 | 110.2 | 88.2 | 71.4 | 57.6 | ||
1600 | 117.6 | 94.1 | 76.2 |
61.2 |
Advantage
1. Recycled and environment-friendly.
2. PE has excellent chemical stability, good flexibility.
3. Light weight, easy to install and lower transport and maintenance.
4. Nontoxic, no Leakage, higher flow capacity.
5. High corrosion resistance, long service life.
6. Applied to water supply, drainage, industrial liquid, municipal works, agricultural irrigation etc.
Details
Application
1. Power and communication cable protection sleeves, etc.;
2. Irrigation and drainage of farmland water conservancy;
3. Drainage transportation of sewage treatment plants and garbage disposal sites;
4. Underground rainwater and sewage discharge in municipal engineering and residential quarters;
5. Chemical ventilation pipe and chemical industry and mine are used for fluid transportation.
Certificate
Company Profile
High Mountain Pipe has passed ISO 9001, ISO 14001, OHSAS 18001 management system certification and China environmental labeling product certification. The company is applying for CQC (China Quality) certification and CNAS (China National Accreditation Service for Conformity Assessment) national laboratory qualification accreditation. Efficiently treating our customers as partners with sincerity, specialization and satisfaction is our managerial principle.
Long-term stock products: FRPP pipes, HDPE pipes, PP pipes, PPH pipes, PP boards, PE boards, UHMWPE boards and all pipe fittings.Pipes and plates with special quality requirements and colors, large quantities can be customized according to customer requirements and colors.
FAQ
Q: Which payment is available for your company?
A: T/T, L/C or Ali trade insurance. You can choose the one which is convenient for you.
Q: After reading your FAQ, I am very satisfied. How can I start buying my order?
A: Please contact our sales manager by email or phone, thank you.
Q: What are raw materials?
A: PE.